CSTE Certification question dumps on Software Testing Manual Testing.
1.
Premature release is defined as releasing the software into production under
which of the following conditions EXCEPT?
1. Test report is not
prepared
2. The test plan has not
been completed
3. The requirements were
implemented incorrectly
4. The test plan has not
been completed.
2.
Bottoms up integration testing has as its major advantages so that
1. major decision points
are tested early
2. no drivers needs to be
written
3. no stubs needs to be
written
4. regression testing is
not required
3.
_____________ provide direction, ______________are the rules or measures by
which the implemented policies are measured and the ____________ are the means
used to meet or comply with the standards
1. Standards, Policies ,
procedures
2. Policies, standards, procedures
3. Standards, procedures,
policies
4. Policies, procedures,
standards
5. Procedures, policies,
standards.
4.
Cost of non-confirmation includes
1. Training Survey etc.
2. Survey Studies
3. Training Survey etc.,
Studies and Survey
4. Rework
5.When
should you stop testing
1. When the quality goals
established in the beginning of the projects are met
2. when you run out of time
3. None of the listed
options
4. when all the test cases
are done
6.
Some of the primary testing risks include EXCEPT
1. Not Enough Training Lack
of Test Competency
2. Lack of Customer and
User involvement
3. Lack of management
support
4. Lack of Test tools
7.
Given the following costs
User
documentation $1000, Rework - 1500$, Design - 400$, Review of user documents -
800$, code review 1200$, The cost of quality is
1. $2400
2. $5000
3. $3500
4. $4000
8.
Testing that may involve intentionally causing the system to fail so that
recovery procedures can be tested is called
1. Stress testing
2. Recovery testing
3. Disaster
testing
4. Security testing
9.
Post Mortems Review is an Process Review (T/F) True
10. A Changes has been
done to the design of an application, which of the following is required after
this changes is implemented
1. Unit retesting
2. Subsystem retesting
3. None of the listed
options
4. Design re verification
5. All the listed options
11. _______________ are
important elements of test objectives
1. Feasible and simple
2. Affordable and Flexible
3. Reasonable and
understandable
4. Reasonable and Adequate
(Note:
Applicable, reasonable, adequate, feasible, affordable are all test objectives)
12.
Unit testing is conducted in the development environment (T/F). True
13.
Test planning should begin
1. before Requirement
collection
2. At the time of
Requirement definition
3. after Requirement
collection
4. after design
14.
Summary project status report include information like
1. Resource, status, budget
2. Time, status, budget
3. Resource, budget, time
4. time, resource, budget
15.
Following are the examples of satisfaction metrics EXCEPT
1. Ease of use
2. Acceptance criteria met
3. Customer subject
assessment
4. Customer satisfaction
16.
A white box testing technique that measures the number of or percentage of
decision outcomes covered by the test cases designed is called
1. Consistent condition
set
2. Basis path coverage
3. Modified decision
coverage
4. Decision coverage
17.
The functional testing that verifies the procedures to balance file function
property is called
Compatability testing
File integrity
File integrity
Compliance testing
Integration testing
Integration testing
18.
Activities asssociated with risk management are
Risk
reduction methods
Risk analysis
Risk Migitation
Risk analysis
Risk Migitation
Risk estimation
19.
One of the most commonly identified weakness in software testing is
lack of time
lack of skilled resources
lack of metrics
lack of defects count
lack of skilled resources
lack of metrics
lack of defects count
20.
To develop a software test matrix follow these steps EXCEPT
Definite
test plan
prepare the software test matrix
define test as required
define verification tests
21.
Test coverage can be measured by EXCEPT ________________
Traceability
Global data coverage
All of the listed options
User specified data coverage
Statement coverage
22. When one application feeds data to second
application, the latter application is called as _____________application
Regression
Stage containment
Stage containment
Downstream
Message Processing
Message Processing
23.
The test tool that is used to test manual procedures in order to verify whether
authorization procedures are followed is
Symbolic execution
Cause effect graphing
Inspections
Pareto analysis
24.
Which of the following testing demonstrates key functional capabilities by
testing a string of units that accomplish a specific function in the
application?
Thread
testing
Unit testing
Integration testing
Black box testing
Unit testing
Integration testing
Black box testing
25.
Due to a change in design, the requirement for an already coded critical
software component got modified in its entirely. The developer had to
modify the code based on new requirement. Testing team is to choose the
appropriate type of regression test to minimize the impact to the project
schedule. Which type of regression test would you choose.
Full
regression test
Unit regression test
Regional regression test
System Testing
26.
Cost of confirmation includes
Training Survey etc.
Survey
Studies
Survey
Studies
Training Survey etc.,
Studies and Survey
Rework
Studies and Survey
Rework
27.
The test schedule section includes which of the following except
Sequence of tests
Major test activities
The
types of tests that must be conducted
Initial estimates for each activity
28. High priority in
any defect management program should be
To improve the process
All the listed options
to prevent defects
to
identify the best prevents on techniques and implement them
29.
Testers insert additional code into a program to collect information about
program behavoiur during program execution. This is called as ___________
Instrumentation
Dynamic assertion
Inspection
Integration Testing
Dynamic assertion
Inspection
Integration Testing
30.
The inability of a system or components to perform its required functions when
specified requirement is called
Bug
error
error
Failure
Defect
Defect
31.
Which of the following statement about different risk type is correct?
It is not difficult to create test scenarios for high level risks
Strategic
risks are the high level business risk faced by the software system
Tactical risk are subsets at a higher level of the strategic risks
32.
Which among the following is NOT a way to define and measure test coverage?
User specified data coverage
Global data coverage
Stable/
Control Coverage
Modified Decision coverage
33.
Which among the following is the correct sequence to test execution?
Identify test cases and test cycles, assign test scripts, set up test
environment, review test cases
Set
up test environment, identify test cases and test cycles, assign test scripts,
review test results
Set up test environment, identify test case, review test result, assign test
scripts
All the listed options
34.
Following are examples of intentional act EXCEPT
False message may be inserted into the system
Communication
protocol may fail to positively identify the transmitter or receiver of a
message
Messages may be recorded and replayed into the system
If encryption (i.e use of codes) is used may be stolen
35.
Which among the following is a suggested prioritization method to follow?
Critical, Major, Low
Major, Minor, High
Critical, Major, Minor, High
Critical, Low, High
Critical
, Major, Minor
36.
Without preparation of a test plan, at an earlier testing phase, tests may be
________________
Economical
uneconomical and ineffective
uneconomical and ineffective
None of the listed
options
effective
effective
37.
Following are the valid defect types EXCEPT
Missing
Wrong
Wrong
Extra
Change Request
Change Request
38.
The test technique to enter errorneous data to determine it cannot affect the
integrity of the files is called ______________
Security
Functional
Functional
Error handling
File integrity
File integrity
39.
Creating representative processing conditions using test transactions is the
concept of _______________
Test plan preparation
Test data preparation
Test data preparation
All the listed options
Requirements Traceability Matrix
Requirements Traceability Matrix
40.
_______________ is used to record data as it is gathered
Certification
Checksheet
Checksheet
Checkpoint
All the listed options
All the listed options
41. Test objectives
______________________
Enable the tester and project manager to guage testing progress and success
Guide
the development of test cases, procedures and test data
Enhance communication both within and outside of the project team by helping to
define the scope of the testing effort.
42.
One of the most effective method for estimating expected impact of risk is ______________
Pareto Analysis
None of the listed options
Annual
loss expection formula
Risk analysis
43.
A Static analysis technique that derives a symbolic expression for each program
path is called _______________
Structural
testing
Statistical process control
Statistical process control
None of the listed options
Symbolic execution
Symbolic execution
44.
_______________ in a test phase verifies the application being tested could
correctly communicate with interrelated application system
Coupling
Functional testing
Functional testing
Unit
testing
Regression testing
Regression testing
45.
Which of the following statement is NOT correct?
90 % of all defects are caused by process problems
Reviews are generally greater than 65% efficient in finding defects
60% of software defects originate in the requirements phase of the project
Over
50% of the life cycle of software system is spent on requirements
46.
Priority of defects should be given to on that caused data corruption, system
crash and security violations (T/F). True.
47.
Which among the following is a set of predefined action items used by test for
a process to be complete and acceptable?
Formal
analysis
Exit
criteria
Force field analysis
Error guessing
48.
When we talk about analysis performed by executing the program code, we are
talking about _____________
Force field analysis
Dynamic analysis
Dynamic analysis
Formal
analysis
None of the listed options
None of the listed options
49.
Following are the key concepts of the process engineering program EXCEPT
Absolute compliance to standard and procedures is required (Process Engineering)
Absolute compliance to standard and procedures is required (Process Engineering)
Process
is driven by testing projects (Not a Process Engineering)
Program is driven by management policies (Process Engineering)
Management provides an organizations structure for the workers to develop their own standards and procedures. (Process Engineering)
Program is driven by management policies (Process Engineering)
Management provides an organizations structure for the workers to develop their own standards and procedures. (Process Engineering)
50.
How do you track requirements in test case?
Requirement documents
Traceability Matrix
Test Plan
None of the above
For more articles on Manual testing log on to : Manual Testing
Traceability Matrix
Test Plan
None of the above