371. Link Testing is also
called as :
a) Component Integration testing
b) Component System
Testing
c) Component Sub System
Testing
d)Maintenance testing
372.
Rule 1
Rule 2 Rule 3 Rule 4
Conditions
Indian resident? False
True True True
Age between 18 – 55?
Don't care False True True
Married? Don't Care Don't
Care False True
Actions
Issue Memebership? False
False True True
Offer 10% discount? False
False True False
A.TC1: Anand is a 32
year old married, residing in Kolkatta.
B.TC3: Attapattu is a
65 year old married person, residing in Colombo.
a. A – Issue membership,
10% discount, B – Issue membership, offer no discount. B
b. A – Don’t Issue
membership, B – Don’t offer discount. C
c. A – Issue membership, no discount, B – Don’t Issue membership.
d. Issue membership, no
discount, B- Issue membership with 10% discount.
373. Methodologies
adopted while performing Maintenance Testing:-
a) Breadth Test and Depth Test
b) Retesting
c) Confirmation Testing
d) Sanity Testing
374. Which of the
following is true about Formal Review or Inspection:-
i. Led by Trained Moderator
(not the author).
ii. No Pre Meeting
Preparations
iii. Formal Follow up
process.
iv. Main Objective is
to find defects
a) ii is true and
i,iii,iv are false
b) i,iii,iv are true and ii is false
c) i,iii,iv are false and
ii is true
d) iii is true and I,ii,iv
are false
375. The Phases of
formal review process is mentioned below arrange them in the correct order.
i. Planning
ii. Review Meeting
iii. Rework
iv. Individual
Preparations
v. Kick Off
vi. Follow Up
a) i,ii,iii,iv,v,vi
b) vi,i,ii,iii,iv,v
c) i,v,iv,ii,iii,vi
d) i,ii,iii,v,iv,vi
376. Consider the
following state transition diagram of a two-speed hair dryer, which is operated
by
pressing its one
button. The first press of the button turns it on to Speed 1, second press to
Speed 2 and
the third press turns
it off.
Which of the following
series of state transitions below will provide 0-switch coverage?
a. A,C,B
b. B,C,A
c. A,B,C
d. C,B,A
377. White Box
Techniques are also called as :-
a) Structural Testing
b) Design Based Testing
c) Error Guessing Technique
d) Experience Based
Technique
378. What is an
equivalence partition (also known as an equivalence class)?
a) A set of test cases
for testing classes of objects
b) An input or output range of values such that only one value in
the range becomes a test case
c) An input or output
range of values such that each value in the range becomes a test case
d) An input or output
range of values such that every tenth value in the range becomes a test case.
379. The Test Cases
Derived from use cases
a) Are most useful in uncovering defects in the process flows
during real world use of the system
b) Are most useful in
uncovering defects in the process flows during the testing use of the system
c) Are most useful in
covering the defects in the process flows during real world use of the system
d) Are most useful in
covering the defects at the Integration Level
380. Exhaustive Testing
is
a) Is impractical but possible
b) Is practically
possible
c) Is impractical and
impossible
d) Is always possible
381. Which of the following
is not a part of the Test Implementation and Execution Phase
a) Creating test suites
from the test cases
b) Executing test cases
either manually or by using test execution tools
c) Comparing actual
results
d) Designing the Tests
382. Which of the
following techniques is NOT a White box technique?
a) Statement Testing and
coverage
b) Decision Testing and
coverage
c) Condition Coverage
d) Boundary value analysis
383. A Project risk
includes which of the following :
a) Organizational Factors
b) Poor Software
characteristics
c) Error Prone software
delivered.
d) Software that does not
perform its intended functions
384. In a risk-based
approach the risks identified may be used to :
i. Determine the test
technique to be employed
ii. Determine the
extent of testing to be carried out
iii. Prioritize testing
in an attempt to find critical defects as early as possible.
iv. Determine the cost
of the project
a) ii is True; i, iii, iv
& v are False
b) i,ii,iii are true and iv is false
c) ii & iii are True;
i, iv are False
d) ii, iii & iv are
True; i is false
385. Which of the
following is the task of a Tester?
i. Interaction with the
Test Tool Vendor to identify best ways to leverage test tool on the project.
ii. Prepare and acquire
Test Data
iii. Implement Tests on
all test levels, execute and log the tests.
iv. Create the Test
Specifications
a) i, ii, iii is true and
iv is false
b) ii,iii,iv is true and i is false
c) i is true and
ii,iii,iv are false
d) iii and iv is correct
and i and ii are incorrect
386. The Planning phase
of a formal review includes the following :-
a) Explaining the
objectives
b) Selecting the personnel, allocating roles.
c) Follow up
d) Individual Meeting
preparations
387. A Person who
documents all the issues, problems and open points that were identified during
a
formal review.
a) Moderator.
b) Scribe
c) Author
d) Manager
388. Who are the persons
involved in a Formal Review :-
i. Manager
ii. Moderator
iii. Scribe / Recorder
iv. Assistant Manager
a) i,ii,iii,iv are true
b) i,ii,iii are true and iv is false.
c) ii,iii,iv are true and
i is false.
d) i,iv are true and ii,
iii are false.
389. Which of the
following is a Key Characteristics of Walk Through
a) Scenario , Dry Run , Peer Group
b) Pre Meeting
Preparations
c) Formal Follow Up
Process
d) Includes Metrics
390. What can static
analysis NOT find?
a) the use of a variable
before it has been defined
b) unreachable (“dead”)
code
c) memory leaks
d) array bound violations
391. Incidents would not
be raised against:
a) requirements
b) documentation
c) test cases
d) improvements suggested by users
392. A Type of
functional Testing, which investigates the functions relating to detection of
threats, such as
virus from malicious
outsiders.
a) Security Testing
b) Recovery Testing
c) Performance Testing
d) Functionality Testing
393. Which of the
following is not a major task of Exit criteria?
a) Checking test logs
against the exit criteria specified in test planning.
b) Logging the outcome of test execution.
c) Assessing if more
tests are needed.
d) Writing a test summary
report for stakeholders.
394. Testing wherein we
subject the target of the test , to varying workloads to measure and evaluate
the
performance behaviors
and ability of the target and of the test to continue to function properly
under
these different
workloads.
a) Load Testing
b) Integration Testing
c) System Testing
d) Usability Testing
395. Testing activity
which is performed to expose defects in the interfaces and in the interaction
between
integrated components
is :-
a) System Level Testing
b) Integration Level Testing
c) Unit Level Testing
d) Component Testing
396. Static analysis is
best described as:
a) The analysis of batch
programs.
b) The reviewing of test
plans.
c) The analysis of program code.
d) The use of black box
testing.
397. One of the fields
on a form contains a text box which accepts alpha numeric values. Identify the
Valid
Equivalence class
a) BOOK
b) Book
c) Boo01k
d) book
398. Reviewing the test
Basis is a part of which phase
a) Test Analysis and Design
b) Test Implementation
and execution
c) Test Closure
Activities
d) Evaluating exit
criteria and reporting
399. Reporting
Discrepancies as incidents is a part of which phase :-
a) Test Analysis and
Design
b) Test Implementation and execution
c) Test Closure
Activities
d) Evaluating exit
criteria and reporting
400. Which of the
following items would not come under Configuration Management?
a) operating systems
b) test documentation
c) live data
d) user requirement
document
Post a Comment