461. Which of the following techniques is NOT a black box technique?
a) State transition
testing
b) LCSAJ (Linear Code Sequence and Jump)
c) syntax testing
d) boundary value
analysis
462. Success Factors for
a review include :
i. Each Review does not
have a predefined objective
ii. Defects found are
welcomed and expressed objectively
iii. Management
supports a good review process.
iv. There is an
emphasis on learning and process improvement.
a) ii,iii,iv are correct and i is incorrect
b) iii , i , iv is
correct and ii is incorrect
c) i , iii , iv , ii is
in correct
d) ii is correct
463. Defects discovered
by static analysis tools include :
i. Variables that are
never used.
ii. Security
vulnerabilities.
iii. Programming
Standard Violations
iv. Uncalled functions
and procedures
a) i , ii,iii,iv is correct
b) iii ,is correct
I,ii,iv are incorrect.
c) i ,ii, iii and iv are
incorrect
d) iv, ii is correct
464. Test Conditions are
derived from :-
a) Specifications
b) Test Cases
c) Test Data
d) Test Design
465 Which of the
following is true about White and Black Box Testing Technique:-
a) Equivalance
partitioning, Decision Table and Control flow are White box Testing Techniques.
b) Equivalence
partitioning , Boundary Value Analysis , Data Flow are Black Box Testing
Techniques.
c) Equivalence partitioning , State Transition , Use Case Testing
are black box Testing Techniques.
d) Equivalence Partioning
, State Transition , Use Case Testing and Decision Table are White Box
Testing Techniques.
466. Regression testing
should be performed:
i. every week
ii. after the software
has changed
iii. as often as
possible
iv. when the
environment has changed
v. when the project
manager says
a) i & ii are true,
iii, iv & v are false
b) ii, iii & iv are
true, i & v are false
c) ii & iv are true, i, iii & v are false
d) ii is true, i, iii, iv
& v are false
467. Benefits of
Independent Testing
a) Independent testers
are much more qualified than Developers
b) Independent testers see other and different defects and are
unbiased.
c) Independent Testers
cannot identify defects.
d) Independent Testers
can test better than developers
468. Minimum Tests
Required for Statement Coverage and Branch Coverage :-
Read P
Read Q
If p+q > 100 then
Print “Large”
End if
If p > 50 then
Print “pLarge”
End if
a) Statement coverage is
2, Branch Coverage is 2
b) Statement coverage is
3 and branch coverage is 2
c) Statement coverage is 1 and branch coverage is 2
d) Statement Coverage is
4 and Branch coverage is 2
469. Minimum Test
Required for Statement Coverage :-
Disc = 0
Order-qty = 0
Read Order-qty
If Order-qty >=20
then
Disc = 0.05
If Order-qty >=100
then
Disc =0.1
End if
End if
a) Statement coverage is
4
b) Statement coverage is 1
c) Statement coverage is
3
d) Statement Coverage is
2
470. The structure of an
incident report is covered in the Standard for Software Test Documentation
IEEE 829 and is called
as : -
a) Anomaly Report
b) Defect Report
c) Test Defect Report
d) Test Incident Report
471. Which of the
following is the task of a Test Lead / Leader.
i. Interaction with the
Test Tool Vendor to identify best ways to leverage test tool on the project.
ii.
Write Test Summary
Reports based on the information gathered during testing
iii. Decide what should
be automated , to what degree and how.
iv. Create the Test
Specifications
a) i, ii, iii is true and iv is false
b) ii,iii,iv is true and
i is false
c) i is true and
ii,iii,iv are false
d) iii and iv is correct
and i and ii are incorrect
472. Features of White
Box Testing Technique :-
i. We use explicit
knowledge of the internal workings of the item being tested to select the test
data.
ii. Uses specific
knowledge of programming code to examine outputs and assumes that the tester
knows the path of logic
in a unit or a program.
iii. Checking for the
performance of the application
iv. Also checks for
functionality.
a) i, ii are true and iii and iv are false
b) iii is true and i,ii,
iv are false
c) ii ,iii is true and
i,iv is false
d) iii and iv are true
and i,ii are false
473. Which of the
following is a part of Test Closure Activities?
i. Checking which
planned deliverables have been delivered
ii. Defect report
analysis.
iii. Finalizing and archiving
testware.
iv. Analyzing lessons.
a) i , ii , iv are true
and iii is false
b) i , ii , iii are true
and iv is false
c) i , iii , iv are true and ii is false
d) All of above are true
474. Which of the
following will be the best definition for Testing :-
a) The goal / purpose of
testing is to demonstrate that the program works.
b) The purpose of testing
is to demonstrate that the program is defect free.
c) The purpose of testing
is to demonstrate that the program does what it is supposed to do.
d) Testing is executing Software for the purpose of finding
defects.
475. Which of the
following is not a type of incremental testing approach?
a) Top down
b) Big-bang
c) Bottom up
d) Functional
incrementation.
476. Drivers are also
known as:
i. Spade
ii. Test harness
iii. Scaffolding
a) i , ii are true and
iii is false
b) i , iii are true and
ii is false
c) ii , iii are true and i is false
d) All of the above are
true
477. Exit Criteria may
consist of :-
i. Thoroughness
measures , such as coverage of code, functionality or risk
ii. Estimates of Defect
density or reliability measures.
iii. Residual risk such
as defects not fixed or lack of test coverage in certain areas
iv. Verifying the Test
Environment.
a) iv is correct and
i,ii,iii are incorrect.
b) i,ii,iii is correct and iv is incorrect
c) ii is correct and
i,ii,iii are incorrect
d) iii and iv are correct
and i,ii are incorrect
478. Which of the
following helps in monitoring the Test Progress:-
i. Percentage of Test
Case Execution
ii. Percentage of work
done in test environment preparation.
iii. Defect Information
e.g. defect density, defects found and fixed
iv. The size of the
testing Team and skills of the engineers
a) iv is correct and
i,ii,iii are incorrect
b) i,ii,iii are correct and iv is incorrect
c) i,ii are correct and
iii,iv are incorrect
d) i,iv are correct and
ii , iii are incorrect
479. The selection of a
test approach should consider the context :-
i. Risk of Failure of
the Project, hazards to the product and risks of product failure to humans
ii. Skills and
experience of the people in the proposed technique, tools and methods
iii. The objective of
the testing endeavor and the mission of the testing team.
iv. The size of the
testing Team
a) i,ii,iii,iv are true
b) i,ii,iii are true and iv is false.
c) ii,iii,iv are true and
i is false.
d) i,iv are true and ii,
iii are false.
480. In case of Large
Systems :-
a) Only few tests should
be run
b) Testing should be on the basis of Risk
c) Only Good Test Cases
should be executed.
d) Test Cases written by
good test engineers should be executed.
481. The Provision and
Management of a controlled library containing all the configurations items is
called as
a) Configuration Control
b) Status Accounting
c) Configuration
Identification
d) Configuration
Identification
إرسال تعليق